Minutes for
the 1st management meeting of the Tempus project entitled (Building capacity of
personnel in Jordanian olive industry)
Date: February 25- 26, 2015
Place: University of Verona, Italy
Agenda :
1- achieved activities
2- Planning of the students exchange activities
3. Planning of the staff exchange activities
4. Visit to oleificio Turri press
5. Monitoring and review of the financial aspect of
the project
6. Overall review of the critical points of the
project and proposed actions
7. Closing remarks
Wednesday, 25 February 2015
The 1st
session: 1st management meeting (Main training center, Purchasing
equipment, Laboratories)
The 1st
management meeting started at the University of Verona at 8.30 am on Wednesday
25/2/2015 by the attendance of all parteners of the project either European or
Jordanians. During the meeting professor Giovanni vallini Dean of the Dept.of
Biotechnology welcomed the attendance, then Prof. Fabio gave a short speech
about the proposed agenda. The coordinator (prof. Ali Al-Saed) gave a power
point presentation about the achieved activites during the past 16 monthes of
the project duration.
During the
presentation, discussions dealing with several deliverables took place:
•
The construction of the building of
the main training center:
Dr Alsaed
informed the steering committee that 90% of the work related to the
construction of the building of the main training center has been done and it
is expected to be completed by the 1st of May 2015.
•
The construction of the buildings
of the two branches of the training center:
Dr Alabsi and Dr
Rababah informed the meeting that the two branches will be ready by the 1st
of May 2015.
•
Purchasing the needed equipment:
Dr Alsaed
informed the meeting with the results of his visit in November 2014 with Dr
Fabio to Florence/Italy and meeting with several managers of Italian companies
manufacturing olive machinery as well as the quotations received.
He also provided
the meeting with the results of his visit with dr Antonio to Seville/Spain and
meeting with several managers of Spanish companies manufacturing olive
machinery. The received quotations were also reviewed.
The results of
the visit of Turkey by Dr Alsaed and the obtained quotation were also
discussed.
After reviewing
the achieved results of the three visits and the obtained quotations, Dr Alsaed
refered that the Turkish quotation was better than the others since it fulfills
all the specifications needed. Accordingly, the steering committee agreed to start
the process of purchasing the needed equipment from Turkey by the the project
coordinator who is the University of Jordan.
The steering
committee wrote a letter to project disk officer, Mr Clivio, inquiring about
the process of purchacing the needed equipment and an answer was received and
will be considered in the purchacing process.
•
Establishing the sensory and
chemical laboratories:
The Jordanian
partners informed the steering committee that the needed labs
Will be ready by
the 1st of July 2015.
As a result, Dr Maria from the University of Aristol
of Thessaloniki threatened the Jordanian partners saying that Aristole
University will withdraw from the project if the obove tasks were not achieved
by 1st July 2015, justifying such withdrawal with her dislike to
have her university in the Black list by EACEA. The other three EU partners
agreed Dr Maria to have the same action and the Jordanian parteners also
agreed.
Wednesday, 25 February 2015
The 2nd session: 1st management meeting
(Seminars, Visit of distinguished trainers, Staff exchange, Graduate student
exchange)
•
Conducting the seminars and
workshops:
The steering
committee agreed to train trainers for farmers, olive mills, table olive and
sensory teams in 2015 and 2016 with the maximum possible number of trainees and
as planned in the workplan of the project.
The steering
committee studied in depth the EACEA comments after the field monitoring visit
held in Jordan by June 2014 focusing on the training issue. Accordingly, a letter was sent to the project
disk officer, Mr Clivio to clarify
some points
related to farmers training. An answer was received from Clivio with
explanation and clarification for the asked questions.
In the meeting,
a training plan and outline was proposed to be written by Jordanian partners to
cover training of farmers trainers, olive mill trainers, table olive trainers
and olive and olive oil sensory teams trainers. A duration of two weeks were
given for such activity.
Regarding
training on olive oil, an EU expert from Italy to participate in the training
for 1 week in 2015 and another week in 2016.
Relating to training on table olive, a Greek expert to participate in
the training for 1 week in 2015 and another week in 2016.
It was agreed in
the meeting that trainers to be trained (farmer trainers, olive mill trainers,
table olive trainers, olive and olive oil sensory teams trainers) should be
selected by a transparent procedure including advertising in the media, writing
to the related ministiers and organizations
…. etc.
It was also
agreed that the duration of training to be one week (5 working days) for 30
hours (6 hours daily), the training to be divided into two parts
•
theoretical
with a total time of 12 hours
•
practical with a total time of 18 hours
The theoretical
part will be covered by EU experts while the practical will be covered by
Jordanians
•
Visit of distinguished trainers for
one week to Spain
It was greed to
have trainees from different organizations besides the partner insituatins; but
for the visit to Spain by distinguished trainees, members from the partners
insituations should only be included. In
addition to that, the selected trainees should be :
•
Age
of less less than 40 years
•
Relevance
for education and English or Spanish profeciancy
•
Relevance
of job experience
•
The
ratio of female in the selected group should be not less than 50%
•
Staff exchange and course development
The steering
committee discussed this aspect and decided the following:
•
The
coordinator should provide each partner with a copy of the olive master
programme plan.
•
A
copy of the outline of the under
graduate and gradated courses to be taught and develepped.
Providing each partner with the above matters
should be during 10 days starting from the 3rd of March 2015.
After that, each
partner should send to dr.alsaed what he can participate to have the matching
and the plan about his staff exchange.
•
Graduate student exchange:
The steering
committee agreed to distribute Jordanian students between EU partners in the
following manner:
•
2
students are welcomed by Dr. Maria from april to june 2015
•
2
students are welcomed by Dr. Kostas to be trained on olive oil analysis and
sensory evaluation
•
1
student is welcomed by Dr. Fabio starting from next October 2015 for 60 days to
be trained on HPLC and GC
•
Any
number of students are welcomed by Dr. Antonio at any time
a letter was sent to the project disk
officer, Mr Clivio asking about the possibility of shortening the stay duration
of students from 3 months maximum to 1 or 2 months time. An answer was received
from Clivio with explanation and clarification for the asked questions.
Thursday, 26 February 2015
The 3rd session: (Visit to olive mill)
On Thuresday
8:30 morning the steering committee visited the oleificio turri mill near
Verona city. The committee was welcomed by the vice president of the olio del
Garda PDO association who accompanied the committee for the olive farm and then
to the mill. A presentation about the company was given followed by practicing
a sensory evaluation for olive oil samples the visit ended by 12:30
Thursday, 26 February 2015
The 4th session: (Web site, international olive
product congress, Tasks distribution, Closing remarks)
•
Creating and updating of the
project web site
It was agreed to
update the project website by adding more photos focusing on the main training
center and its two branches as well as photos taken during meeting. Information
and scientific papers related to olives in both Arabic and English to be also
included.
•
Hosting the international olive
product congress in octobor 2016
It was agreed by
the steering committee that Dr. Kostas will start working for this activity by
the end of May 2015 and to provide the partners with an outline. It was also
decided to unify the title of the congress as in the excel table (international
olive product congress) and to be
held in October 2016.
•
The distribution of the project
tasks between partners
It was agreed to
distribute the responsibilities for the activities as follows:
W.P1
|
|
Building
the main training center at JU and
other two branches one the north at (JUSTand BAU) the second at the south at
MU
|
|
|
D.1
|
Construction
of main & it branches
|
|
|
D2
|
Purchasing
the needed equipment
|
|
|
D3
|
Establishing
the three sensory and two chemical
laboratories
|
|
|
D4
|
Project
dissemination meeting
|
|
|
D5
|
Management
meeting to be held in Italy 2014
|
|
The above package and
delivrables are the responsibility of Dr. Ali and the other Jordanian
partners
|
W.P2
|
|
Seminars
and workshops
|
|
|
D1
|
Workshops
for olive farmers
|
|
|
D2
|
Training of table olive personnel
|
|
|
D3
|
Training
of olive mill personnel
|
|
|
D4
|
establishing
three table olive and sensory teams
|
|
|
D5
|
visit
of distingushed trainees for one week to Spain
|
|
The above package and
delivrables are the responsibility of Dr. Ali and dr. Alabsi
|
W.P3
|
|
Staff
and graduate student exchange and courses developing
|
|
|
D1
|
Staff exchange and courses developing
|
|
|
D2
|
Graduate
student exchange
|
|
|
D3
|
Management
meetings to be held in Amman in 2015 and 2016
|
|
The above package and
delivrables are the responsibility of Dr.Ali and dr.Antonio (Staff exchange
and course development) and Dr. Maria ( graduate students exchange)
|
W.P4
|
|
Creating a web site and hosting an
International OliveBiotech conference
|
|
|
D1
|
Creation of the olive web site
|
|
|
D2
|
Hosting the upcoming Olive biotech
congress
|
|
|
D3
|
4th
managgement meeting in Jordan in 2016
|
|
The above package and
delivrables are the responsibility of Dr.Ali,
Ruba (website) and Dr Kostas (olive congress)
|
W.P5
|
|
Management
and quality control
|
|
|
D1
|
Having
a successful management for the project
|
|
|
D2
|
Having
a high quality project
|
|
The above backage and
delivrables are the responsibility of Dr. Ali, and Dr. Fabio
|
W.P6
|
|
Dissemination and sustainability
|
|
|
D1
|
Disseminating
the project activities
|
|
|
D2
|
Sustainability
and continuebility of the project
|
|
The above backage and
delivrables are the responsibility of Dr. Ali, and Dr. Al-Ismael
|
Due to the
modifications conducted on the distributed tasks and to the delay occurred in
the passed 15 months, the table of the work pachages and deliverables were
adjusted and as in the attachment.
In the end of meeting,
the steering committee made the
conclusions of the meeting and made overall review of the critical points of
the projects and proposed actions.
The steering committee
agreed to have an optional Skyp talk on the 1st Wednesday of every
month.
It was agreed to have
any correspondence on Monday and to leave 3 day for answering, after that it